For apartment owners and property teams

Apartment common-area
renovations in Denver.

Improve the spaces residents pass through every day. Metro helps apartment teams plan hallway, lobby and shared-area renovations around durable finishes, building access and the people who still need to use the property.

Finished apartment hallway and elevator lobby with a bench alcove and warm wall finishesBetter shared spaces.
A practical route through the work.

Working with Metro

Your property.
Your priorities.

Bring the people, spaces and operating needs into the same conversation. Define the work around the property you manage.

Make the priorities visible

Separate immediate work from future improvements. Share the unit or area list and the decisions your team needs to make.

Account for people using the property

Discuss resident access, staff routines, notices and spaces that need to remain available before settling the work sequence.

Compare a defined scope

Review materials, allowances, access and exclusions together. Ask which decisions or property details are still needed for the proposal.

Working with Metro

From the first conversation
to a defined plan.

01

Walk the shared route

Provide plans or marked photos showing the areas, existing conditions and the routes that must remain available.

02

Set finishes and phasing priorities

Compare materials, sample areas and work boundaries. Clarify who handles notices, access decisions and on-site approvals.

03

Review completion by area

Agree on how each section will be inspected and handed back before the next phase is scheduled.

Denver planning and estimate details

A Denver building.
A site-specific sequence.

Share the property address, building layout and loading or elevator restrictions. A corridor update in a walk-up and a lobby renovation in a multi-story building need different access conversations.

Denver’s commercial and multifamily resources identify the city review path. Proposed layout, door, electrical or other construction changes should be considered as part of the scope before scheduling the finishes.

Denver’s commercial and multifamily project resources
  • Area and finish specification

    Measurements, substrate conditions and material selections make the proposed work clearer.

  • Building interfaces

    Review doors, elevators, stairs and existing lighting where the work meets them.

  • Resident access and phases

    Temporary routes, work zones and the number of handbacks affect how the job is organized.

A useful estimate names the work, assumptions, allowances and exclusions. Share the decisions that are still open.

What Metro customers say

★★★★★
“Brandon and his team are always quick to respond and specialize in communication, customer service, and professionalism.”

Alex Martinez

Google review · Metro Construction Group

Read more customer reviews

Before you request an estimate

Questions worth
working through.

Bring these details into the first conversation so the proposed work matches your priorities.

How is this different from a clubhouse renovation?

Common-area renovation covers circulation, entries and everyday shared building spaces. A clubhouse or amenity room brings different room-use and equipment questions.

Can work happen while residents stay on site?

Discuss occupancy, access and the required routes before planning phases. A workable sequence depends on the building and the proposed work.

Should we choose materials before requesting an estimate?

Share any standards you already use. If selections are open, identify the traffic level, appearance and maintenance priorities so alternatives can be discussed.

What should we send first?

The address, a marked area list, photos, rough measurements and access restrictions provide a useful starting point. Include your property contact and preferred timing.

The next useful step

Keep the whole
project connected.

Use the related service pages to compare the work you need. Share the exact property address to discuss coverage and the right local process.

Let’s talk about your project

Share the property.
Define the work.

Send the property details, area or unit list and operating constraints. Metro can review the proposed renovation with your team.

  • Property address and marked plans or area list
  • Photos and existing finish information
  • Resident routes and access restrictions
  • Preferred phases and property-team contacts